ALTERNATIVE B: RESURFACING, RESTORATION, AND REHABILITATION
Roadway
This alternative refers to resurfacing, restoration, and rehabilitation of the
existing roadway starting at milepost 65.5, the western boundary of the park,
and ending at milepost 73.2, just west of Annie Springs Junction. It is intended
to improve poor pavement conditions, restore adequate drainage, and improve
sight distances. New traffic control and informational signage would be
installed. The road would be improved within the existing road alignment; no
widening would take place. It would include recycling a portion of the existing
roadway surface and base; laying, leveling, and compacting this material; and
applying a 3-inch asphaltic concrete overlay. Subexcavation of unsuitable
sub-grade material and backfill with free-draining sub-base would be performed,
as necessary.
Guardrails would be maintained, replaced, or added as determined necessary for
safety. Guardrails not needed would be removed and stored, if in good condition,
by the park for reuse at another location. Culverts that are partially plugged
would be cleaned to improve drainage. Cuts and fill slopes would be between
1.5:1 (1 foot vertical rise to 1.5 feet of horizontal run) and 2:1 (1 foot
vertical rise to 2 feet of horizontal run).
Topsoil and forest duff from the project site would be salvaged and stored to
restore areas of disturbance. The storage would be within the existing Highway
62 West corridor or at designated staging sites on previously disturbed ground.