ALTERNATIVE B: RESURFACING, RESTORATION, AND REHABILITATION
Switchbacks
The road segment from milepost 71.1 to milepost 71.5 contains two switchbacks.
In this alternative, the roadway would be resurfaced and rehabilitated, and
widened to the greatest extent possible within the existing alignment to assist
with wider tracking vehicles. The road would remain in the existing alignment
and within the previously disturbed area.

FIGURE 4. WHITEHORSE CROSSING PROPOSED PROFILE REDUCTION