ENVIRONMENTAL CONSEQUENCES
<<
Previous
|
Table of
Contents |
Next
>>
ALTERNATIVE A: NO ACTION
This section evaluates the potential impacts of the no-action alternative.
Park Operations
The no-action alternative would leave the road with the existing tight curves
and a poor surface condition. There would be no change to park maintenance
operations from the no-action alternative, and the periodic maintenance
operations undertaken to maintain the road surface would continue to be
required; although, the condition of the road is anticipated to continue to
deteriorate with age. The tight curves would continue to impede snow removal
operations and create a safety hazard for vehicles and snow plows. There would
be no change in park operations under the no-action alternative; however, the
existing condition constitutes a long-term, minor to moderate, adverse impact to
park maintenance operations.
Cumulative Impacts. Past, present, and reasonably foreseeable future actions
that would have an effect on park maintenance operations include trails
rehabilitation and relocation, the reconstruction of the Rim parking lot, the
waterline replacement from Munson Springs to Garfield, the lagoon project at
Munson Valley, and rehabilitation of the superintendent’s house. The effects of
these projects would be long term and negligible beneficial. The no-action
alternative would not contribute to these actions.
Conclusion. The no-action alternative would not change park maintenance
operations along Highway 62 West. The no-action alternative would not contribute
to cumulative impacts.