ENVIRONMENTAL CONSEQUENCES
<<
Previous
|
Table of
Contents |
Next
>>
ALTERNATIVE B: RESURFACING, RESTORATION, AND
REHABILITATION
This section evaluates the potential impacts of alternative B.
Visitor Use, Traffic, and Highway Safety
This alternative would not add to traffic volume or visitor use for this area of
the park.
Over the short term, visitor experience would be adversely affected by noise,
dust, fumes, delays, increased congestion, and construction vehicle traffic
along this section of Highway 62 West for the duration of road reconstruction
activities. Some visitors would be dissatisfied because they would be unable to
visit a particular feature or features due to road reconstruction actions, work
on parking lots, and turnout closures. This would result in a short-term,
negligible to minor, adverse impact. However, during the rehabilitation of
Highway 62 West, speeds would be reduced in construction zones, possibly
resulting in the reduction of the number and severity of vehicle accidents in
these segments. This would result in a short-term, negligible, beneficial effect
to safety.
The reconstructed road would provide a smoother ride. The consistent 11-foot
travel way would meet the recommended National Park Service road standard for
lanes. The consistent width would reduce frustration for some visitors,
especially those operating large vehicles. Additional signage and appropriate
guardrail installation would also improve the driving experience and safety.
This would result in a long-term, negligible, beneficial effect.
The most dramatic change would be for eastbound drivers at Whitehorse Crossing.
The hill would be flattened allowing for greater sight distance to the upcoming
curve. Drivers may be able to anticipate the curve and adjust their speed
accordingly, possibly resulting in a reduction in the number and severity of
accidents along this segment of the road. This would result in a long-term,
negligible, beneficial effect to visitor use and highway safety.
The reconstruction associated with alternative B would also allow for improved
sight distance and safer egress of the Pacific Crest Trail parking lot and at
remaining turnouts. This would result in a long-term, negligible beneficial
effect to visitor use and highway safety. The loss of a turnout would have a
long-term, negligible, adverse effect to visitor use.
Cumulative Impacts. Past, present, and reasonably foreseeable future actions
that would have an effect on visitor use, traffic, and highway safety include
trail rehabilitation and relocation, and the reconstruction of the Rim parking
lot. The effects of these projects would be long term and negligible beneficial.
Alternative B would contribute a long-term, negligible, beneficial effect to
these actions.
Conclusion. Alternative B would have short-term, negligible to minor, adverse
effects on traffic and visitor use, and a negligible, beneficial effect on
safety. However, alternative B would have a long-term, negligible beneficial
effect on visitor use, traffic, and highway safety. The cumulative effect would
be long term, negligible, beneficial.